Supervision at the Dakar 2017


Supervision copes with extreme weather conditions

[su_row][su_column size=”1/2″]

The screen positioned at El Central has broadcasted live all the 2017 Dakar stages without weakening in spite of the heavy rain that hit Bolivia.

Alternating periods of flood and drought demand better management of the equipment deployed on the ground. Supervision has shown once again its capability to maintain intensive work for the entire event and to adapt to extreme climatic conditions and tackled this challenge applying creative ingenuity.

Arturo Urrejola, the giant screen Manager at El Central, installed the M5.8, a video screen featuring the latest SMD LED technology as well as all the necessary advantages for a perfect integration in these extreme environments :
▪ the highest screen resolution producing a much sharper result
▪ its watertightness and its robustness to perform well in any extreme and rough weather
▪ A high-contrast level that provides exceptionally easy to read videos in all lighting conditions

[/su_column] [su_column size=”1/2″][su_carousel source=”media: 11113,11114,11115,11116,11177″ link=”lightbox” width=”800″ height=”500″ items=”1″ title=”no” autoplay=”yes” speed=”3000″][/su_column] [/su_row]